Egyptian LNG logo
The Communication Environment between the Employee and his Manager
 
 

Search
Port

Idku LNG port is the largest specialized LNG export facility in Egypt capable to accommodate the largest LNG vessels up to 160,000 m³.

The port facilities comprise anchorage waiting area, a free stand breakwater, a

dredged approach channel of 4 km long and 230 m wide, a turning basin of 600 m

in diameter, a trestle style jetty 2.4 km long.

An LNG berth located at the jetty head and comprises a loading platform with three loading arms and one vapour return arm. Four breasting dolphins and six mooring dolphins facilitate the mooring of the LNG tanker to the LNG berth.

 

Please refer to Idku LNG Port Regulation and Information Manual (download)

 

Location

Idku LNG Port is located on Egypt’s Mediterranean Coast

on the East of Bay of Abu Qir, 40 km east of Alexandria.

 

Latitude 31° 21’ 7.9” N   Longitude 30° 18’40” E

 

Port Limits

Idku LNG Port is bounded by the following Positions:

31° 24.78’ N   30° 15.74’ E

31° 21.83’ N   30° 19.19’ E

31° 20.80’ N   30° 18.42’ E

31° 23.73’ N   30° 15.02’ E

 

In addition to the Anchorage Waiting Area of One mile radius centred in the

following Position:

Lat 31° 27.6’ N, Long 30° 13.6’ E

 

Charts

British Admiralty Charts B.A. 2681, and Egyptian Hydrographical Charts No. M12 &

M13.

 

Management:

The port is managed and operated by port operations department, which offer

services to LNG vessels include the following

  Port Operations

  Port control

  Port Authorities 

  Pilotage

  Port regulations

  Port Scheduling

The marine department provides a safe and efficient Port Operation to

accommodate       different sizes of vessels calling the Port.

 

ISO Certification

In January 2007 Idku LNG Port operations became the first port in Egypt

certified for ISO 9001-2001, 14001:2004 and OHSAS 18001

 

 

          

Pre Arrival Information

 

Vessels calling Idku port are required to provide the Port Operations with the

following: 

·    Where applicable, ETA 7 days, to be updated 72/48/24/12/6    hours before

arrival.

·    The 72 hours ETA notice shall include the pre arrival data as mentioned in

the port regulations manual.

·    Within two hours of arrival, vessels should contact “Port Control” by VHF

Ch 17

 

Approaches

The approach channel and the break water re-aligned to the direction 315° – 135°

to protect the jetty area from the prevailing North West wind.

 

Pilotage

Available 24 hours a day, pilotage is compulsory for all vessels navigating

within the port area, except for the following exempted vessels where the Master

has, in the opinion of Port management, sufficient knowledge of the port and

approaches:

 

  Supply boats authorized by Port Management to use the port on a regular base

for their offshore operations and maintenance.

• All tugs operating as such exclusively within Idku LNG Port Area.

  Military, Coastguard, Customs or Police Vessels

  Any other vessel exempted by the Port Management.

 

Boarding Area

Vessels arriving from sea shall proceed to pilot boarding area two nautical

miles from the channel entrance.

 

Towage

All towage operations within the port limits shall be performed by tugs provided

by the Port Management.

The port operates:

   4 ASD FIFI Tugs (60 ton B.P)

   2 mooring launches

   1 pilot boat

 

Vessel acceptance:

Before vessel acceptance a full compatibility studies to be carried out using

analysis computer program based on the OCIMF recommendations.  

 

Port Services

Only services provided or authorized by the Port Management shall be utilized

within the port area.

 

 
Commercial Structure
IDKU Egyptian LNG Specialized Port 

 

News | Useful Links | Sitemap | Contact Us